If you are just checking the blog, be sure to go to yesterday's entry - Renovations! - for the first installment of our renovation tour...
Okay, so I left off with the floors being installed on Day 12. At this point, we were still dead set on getting the kitchen move-in ready by our D-Day and were putting in very long hours to make it happen. On Day 13, the kitchen cabinet installation began. Let me clarify - the kitchen cabinets were installed by two very handy homeowners named Brock and Amy. :) I should also tell you that while it was very tedious at times (mainly because our house, like every other home in Florida, is built on a slab thus making the floor far from level) doing the work ourselves saved us another chunk of change. I think it was our determination and the fact that we are both perfectionists that enabled us to get the cabinets installed. The granite company that installed our countertops (some things should be left to the pros) said that the cabinets were the most level and plumb installation that they had dealt with. Also, those compliments came before they knew who installed them. So kudos to us!
Here is a photo tour of the cabinet installation:
Kitchen (View #3 - Cabinets)
Off to a great start...
Kitchen (View #3 - Cabinets)
End of Day 13...
Kitchen (View #4 - Cabinets)
I love my appliances... If anyone is in the market for new ones, I highly reccommend Electrolux. The stove has a double oven. The lower oven is small, but the perfect size for bread or pies.
Kitchen (View #3 - Cabinets)
Making headway - We relocated all of the appliances, but we left the sink in its original location due to both the cost and labor-intensive task of moving plumbing work in the slab.
Kitchen (View #2 - Cabinets)
The island is installed - To begin with, I only wanted an island that was just a little bit bigger than the one in our previous house, but ended up with one twice the size because this kitchen had so much more floor space than I thought. I was able to get a 5'x4' island and still have just over 3 feet of walkway around it.
Kitchen (View #2 - Cabinets)
The empty spot on the left side of the photo is where my refrigerator will be placed and the door opening is the pantry.
Kitchen (View #3 - Cabinets)
This is Day 15 - It took us a while to get everything installed, but we did it.
Kitchen (View #2 - Cabinets & Granite)
Our granite countertops were installed on Day 16.
Kitchen (View #3 - Cabinets & Granite)
The island has a 10-inch overhang which is the designated area for the girls - breakfast and lunch is enjoyed here as well as all of the homework that is accomplished while Mom is cooking dinner! :)
Kitchen (View #3 - Cabinets)
The trim was installed to the top of the cabinets.
Kitchen (View #3 - Semi-finished Kitchen)
The kitchen was move-in ready with a few outstanding to do items (installing the drawer pulls, installing the remaining baseboards, etc.) by the end of week 3! Even though we still have a few things left to finish, I love my kitchen! It is a great room for entertaining!!!
Kitchen (View #2 - Semi-finished Kitchen)
You can now see my refrigerator on the left side of this photo. I have another picture below...
Kitchen (View #2 - Refrigerator)
I chose the Electrolux French Door refrigerator. It has so much space and works very well for our family's needs. The freezer on the bottom is great and has much more useable space than our previous side-by-side. Again, if you are in the market, this fridge is fabulous!
I will continue the tour of our renovations in other parts of the house in my upcoming posts. So check back soon!